Don’t get left in the cold this winter, speak with us about boiler servicing

Why not get prepared and take out one of our Service Plans

 Guaranteed to attend to callout within 24 hours
 Includes annual service of boiler
 Exclusive discounts on further works
 Cost can be spread monthly

     

We now offer a 10 year warranty on Vaillant boiler installations, at no additional cost

Please contact us for a free, no obligation quotation

Referral Scheme

Refer a family member or friend to our Service Plan and you will both receive a £25 Love2shop reward code

Plumbing & Heating

CHG South West has an exceptionally highly skilled team of qualified plumbing and heating engineers covering all aspects of domestic and commercial plumbing and heating systems.

Find Out More

Electrical

CHG South West is highly experienced in all aspects of domestic and commercial electrical works, with a team of qualified engineers giving a high quality of service.

Find Out More

Renewables

Full design, supply, installation and maintenance tailor made to your property for PV, Solar Thermal, Ground Source Heat Pumps & Air Source Heat Pumps.

Find Out More

Water Services

Our experienced engineers provide a complete range of Water Treatment Services for both domestic & commercial customers throughout the South West.

Find Out More

Service Plans

Have your boiler serviced annually from as little as £8.03 per month, with guaranteed callout within 24 hours should you need us for anything

Our three levels of Service Plans (Bronze, Silver and Gold) are for maintaining and repairing your central heating system and the level of covered equipment is dependent on the plan you choose.

Tesla Powerwall 2

Powerwall 2 is the ultimate battery for your home, which maximises your solar energy consumption and increases your independence from the electricity grid.  Powerwall 2 enables you to store excess energy generated from solar panels to use at another time, and helps reduce your monthly electricity costs.

Find Out More

Prompt and efficient service from beginning to end. New boiler relocated in an extremely confined space and, with no fuss or mess, the work was completed in one day. Excellent job at a very fair price.

Would highly recommend CHG.

Mrs Price

Beaminster

CHG were very efficient installing our solar PV system within the tight time frame at our very busy Holiday Let property on the Jurassic Coast. They struggled with atrocious weather conditions however they persevered and got the job done on time & budget. We suffered no loss of business, well done all

Mr Ó Lenáin

Burton Bradstock

I would like you and your team to know how pleased Anne-Marie and I are with the really excellent service you have given us. From the time of my first contact with you through to the end of the job, you have been nothing less than courteous, efficient and professional delivering a solution cheaper and better than first envisaged. Even the final connection to the main went beyond the call of duty!

We will be very happy to recommend your company in future.

Mr Henwood

Loders Customer

CHG were asked to attend a domestic site in Oxfordshire where their 3 year old borehole was not supplying sufficient water at peak times of usage. The decision was made to drill a second borehole 50 metres from the existing, at a depth of 60 metres. CHG were then employed to supply and install a Grundfos borehole pump with variable speed controller to work alongside the existing installation to meet the peak flow requirements.

As there was no plant room close to the borehole to hold the controls and pressure vessel a green insulated cabinet was installed close by.

CHG carried out all the trenching work between the borehole and control cabinet and installed the pipework and cable at regulation depth in ducting and with warning tape.

During the survey it had been identified that the power supply to the irrigation system close to the new borehole was undersized to take the addition of a borehole pump so the quote included removing the 6mm cable and the pulling in of a new 10mm supply from the plant room.

During the installation it was discovered that the original 6mm cable had not been installed in a duct but directly in the ground. The ducted cable was going to a green house. Following discussions with the client a route was decided upon in which to run the new 10mm cable involving a third of the distance being run in a trench which was hand dug and reinstated over the next two days.

Following all this work the system was commissioned and produced the flow and pressure the client had been hoping for.

The client said the following after completion of the works…

“I can thoroughly recommend CHG. Extremely professional, efficient and friendly. Problems encountered were resolved quickly and without fuss. A real 5 star service.”

Anonymous, Oxfordshire